1u electronic chassis

FOB Reference Price:Get Latest Price
US $10-100 / Sets | 1000 Set/Sets (Min. Order)
Report Suspicious Activity
Overview
Quick Details
Place of Origin:
Guangdong, China (Mainland)
Brand Name:
Derui
Model Number:
DR-CS-253
Protection Level:
IP65
Type:
Junction Box
External Size:
600*400*150
Material:
SGCC, SPCC, SECC or steel
Surface treat:
Podwer coating
Process:
Laser cutting, drilling ,tapping, bending
More process:
welding, riveting etc.
Thickness:
0.2~2.0 mm
Color:
Grey ,silver , black etc.
SupplyAbility
SupplyAbility:
5000 Set/Sets per Week
Packaging & Delivery
Packaging Details
EPE mat, poly bags and carton boxes.
Port
Shenzhen or Hongkong

 

1u chassis

 

1.Product Information.

 

Part No.SPEC.MaterialSizesWeight
DR-CS-0253Sheet metal CabinetSteel, SGCC, SPCC, SECC, etc.L*W*H3.80 kg

 

Surface FinishTolerance classQuality GradeSamples ProvideMould
Powder coatingIT7Perfect5 pcsExisting mold

 

 

2.The Pictures.

 

 

 

Company Information

Deruiyuan is an precision metal parts manufacturer in China for 10 years .Our products

includes stamping parts, CNC machined/ turning parts , Heat-sink, deep drawn  parts  used in 3C Industries , Electronics ,Home appliance, Aerospace and  Military Industries and so on.

 

 

We provide one stop services for US and Europe market. We have SGS ,TS16949 ,ISO9001:2008, ISO14001: 2004 quality system.

 

Factory facility 

 

Customer

 

Certifications

                     

ISO9001;TS16949;SGS;ROsh

 

FAQ

 

Q1:What’s your business scope and market ?

A:We specialized in OEM /ODM metal parts fabrication like precision stamping parts ,heatsink ,deep drawn part, CNC turned part . We mainly export to European and USA market like United states ,Germany ,Italy,Britain,Spain France ,Canada

 

Q2:What industry do you products apply in?

A:Our products used in follwoing industries 3C listed Consumer Electronics Parts: DVD enclosure, AV enclosure, Metal Frames, Game handset components, BGA shielding frame, HUB enclosure. metal parts, stamping parts NCT and CNC craft: Metal Cabinets, Customer designed metal parts.Heatsink : various shaped copper and aluminum heatsink stamping mold ,sheet metal parts.

 

Q3:How do you ensure your quality ?

A:We have professional engineering team and advanced quality system and device from material inspection,on-process inspection ,delivery inspection.

 

Q4:What's The Lead Time of Sample?
A:For the stamping sample, the lead time is about 15-20days, we have to make the mold.For the machining part, it takes 7days.

 

Q5:How is your order flow  ?

A:When received your part Drawing or Sample ----Quotation----Contract-----Advanced payment --Mold design ---Express Sample & FAI reports-----Customer confirm ----Mass production ---Balance payment ----Inspection & Delivery ----Customer feedback 

Packaging & Shipping

 

Contact