Steel Switch Sheet metal Powder coating Case

FOB Reference Price:Get Latest Price
US $10-100 / Sets | 1000 Set/Sets (Min. Order)
Report Suspicious Activity
Overview
Quick Details
Place of Origin:
Guangdong, China (Mainland)
Brand Name:
Derui
Model Number:
DR-CS-0079
Protection Level:
IP65
Type:
Junction Box
External Size:
600*400*150
Material:
SGCC, SPCC, SECC or steel
Surface treat:
Podwer coating
Process:
Laser cutting, drilling ,tapping, bending
More process:
welding, riveting etc.
Thickness:
0.2~2.0 mm
Color:
Grey ,silver , black etc.
SupplyAbility
SupplyAbility:
5000 Set/Sets per Week
Packaging & Delivery
Packaging Details
EPE mat, poly bags and carton boxes.
Port
Shenzhen or Hongkong
Lead Time :
25 days

Steel Switch Sheet metal Powder coating Case

 

1.Product Information.

 

Part No.SPEC.MaterialSizesWeight
DR-CS-0079  Steel CaseSteel, SGCC, SPCC, SECC, etc.L*W*H2.2 kg

 

Surface FinishTolerance classQuality GradeSamples ProvideMould
Powder coatingISO 2768 mkPerfect5 pcsExisting mold

 

 

2.The Pictures.

 

   

 

 

3.Equipments and Process.

Processing in our factory as following:


Stamping, Turnning, Bending, Punching, Milling, Drilling, Tapping, Cutting, 
Welding,  Griding, Spinning, Deep drawing, CNC machining, Wire cutting, Pressing rivet, Assembly , etc..

 

 

 

 

4.Certificate

 

 

 

5.Trade Terms and notice.
  • Fob: shenzhen or hongkong.
  • Lead time: 20days.
  • Moq: 2000 pcs.
  • Payment by T/T. Should pay deposit, it shall be negotiated.
  • Recommend DHL, UPS to express samples, and sea way for bulk products.

 

 

6.Our advantage.

 

1. Strong technical ablity, advanced management concepts.
2. Strict product quality control systerm, for material inspection, process inspection, 
shipment inspection, strict control of all processes to ensure excellent quality.
3. Strong sense of service, and timely response to customer requirements.
4. Strong product development capabilities, based on customer requirements to develop a 
flexible and reliable solution efficient for customers to solve problems, and reduce the 
costs.
5. Timely delivery.